Day 17 & 18
And the panels came down to reveal the concrete walls of the basement
Next they sprayed a waterproof coating on the outer walls before putting up another layer of waterproofing and insulation panels.
After applying that they back fill the crevice with gravel and top it off with dirt.
So far they have hauled in about 8 loads of gravel for the back fill
and floor.
West to East early am view of the finshed walls of the basement
Moon coming up thru the vent hole at the top of the basement wall
No comments:
Post a Comment