Sunday, January 23, 2011

Week 16: Stairway to Heaven...well to at least the second floor

Week 16

Day 109

Well we've had another snow, which is lovely but it does somewhat impede our progress.  The Farmer's Almanac is proving to be pretty accurate so far predicting a cold wet winter. Nonetheless, a center piece of our home was completed this week...the STAIRS!




18 stairs going 10 ft up with 2 landings...so if you fall you have 2 chances to stop rolling before you hit the bottom!



                       Top of the stairs and foyer landing




View from under the stairs, originally this space would be a coat closet but we decided to use it as a stair well to the basement.



Stairway to Heaven
This doorway will be closed off to begin with.  This leads to the unfinished rooms which we can grow into one day.














Snowy Days

 A blanket of snow covered the first floor, hopefully this will not happen once we have a roof but right now it feels like a dream
 Snowy kitchen and living room
 View of our barn from the second story...pretty.

 



               Open roof breakfast nook 
                from above and within
 I love our views, this is one of my favorite toward Grandaddy's barn from the nursery/library room
 Snow in Sullivan's future big boy room upstairs



Upstairs bedrooms








Completing the Garage ...well a good start at least
Before the wintry mix drove them away on Thursday they were able to build the front of the garage and start on the door side. 

 View from the front, I can barely peer over the windows to see out but because the garage is higher or lower...anyway it will look right in the end

 Inside the garage



View from above into the garage

Tuesday, January 18, 2011

Week 15: View from Above

Week 15
Day 105
January 13, 2011
With the most of the first story complete except for the garage, work began on the subfloor of the second story.



 Mr Larry and Dexter pass the subflooring up thru the rafters to the second floor. Glad its them and not me.


                                
        Work zone with a view

      Future site of 2 of the upstairs bedrooms
                                                                                                                            View to the East
 View of the plates that hold the joists and beams together
 A surreal moment the other day, I went to check on the house and the entire first floor was covered in snow.  It felt like a dream.  Pretty cool!
 Sub-floor down, glued and nailed down.  That should do it!


 Jasper gets very upset when we go upstairs and he cannot come.  This is looking down into the foyer and dining room from what will be attic space.




The finishing touches on the sub floor.  A cold but beautiful day!

Day 106
Friday, January 14, 2011

Time to pour the concrete in the garage!  The minimal temperature they like to pour is 25 degrees so 34 degrees will do!
 2 Loads of concrete to pour the 36' x 24' garage




 Power Trowel Machine/Concrete Polisher.  The concrete was poured about 11 am.  Two of the men stayed until about 9:00 pm with their spot light, checking the consistency and firmness of the concrete and polishing it.  Then about 10:45 pm I look out the window and one of the men and his daughter had returned to cover it in heavy plastic and straw to insulate the wet concrete from the cold night. He said that usually in the summer it takes about 2 hours to cure but in the winter sometimes 12 hours.  We greatly appreciate their patience and persistence!

Materials in the Master bedroom window
 And the sun sets over the breakfast nook

Day 107
Saturday, January 15, 2011

Taking advantage of a beautiful Saturday, the Butler's decided to work today!  While the concrete was being poured yesterday they were hard at work framing up the 2 upstairs bedrooms, closets, and Jack and Jill bathroom
 View of the back of the house, the breakfast nook to the left and back porch and above 2 bedrooms with a view to the north.



View from the front upstairs bedroom to the freshly poured garage floor below.  Note the hay covering it for insulation. 
 This doorway will be closed off to begin with and eventually we will finish out the rest of the upstairs as the kids get older.  For now we will have 2 bedrooms for older Sullivan and guests.
 Looking out the front bedroom "window" toward our house.  The Butler's were taking a break in their cars, probably looking up at me hoping I don't trip and fall off the roof. One day when our little house is moved it will be a pretty nice view.
 View to the East

 Looking down into the foyer where soon the stairs will be.  This is from the landing at the top of the stairs...10 feet straight down!


  Standing in Sullivan's bedroom looking to the  West a one of two closet doorways.
 View towards Grandma and Granddaddy's house and barn
 View from above toward my parent's house where I grew up.  It was built by my dad and his dad the 2 years before I was born.






Rooftop view of the back porch
Patrick and Chris Butler discussing the side porch issue...meanwhile coming to the realization that it was a long way down from there-24 feet to be exact! 



Day 108
The Stooksberry's come for a visit to see the progress.  Despite the weather it was a pretty productive end of the week!